Featured projects
Each project is unique, and at STM we adapt our solutions to meet every client’s expectations.
Doña Inés de Collahuasi mining company
- Project: Early Works - 5th Mill
- Country: Chile
- Year: 2021
Engineering and supply of two 48″ wide conveyor belts for handling Copper Pebbles.
Project developed in only 6 months in EPS mode.
BHP Billiton - Minera Spence
- Project: Belt upgrades
- Country: Chile
- Year: 2021
Engineering, design, manufacturing, and supply of chutes for agglomerated copper ore.
Supply of belt components for agglomerated ore handling.
AMSA - Minera Los Pelambres
- Project: INCO
- Country: Chile
- Year: 2020
Engineering, manufacturing, supply, and assembly supervision of nine conveyors and four feeders for concentrator plant expansion.
CAP Minería
- Project: Port Guacolda II
- Country: Chile
- Year: 2019
Engineering, design, manufacturing, supply, and technical assistance for the assembly and commissioning of a 60″ wide, 93-meter long shiploader for iron ore.
BHP - Cerro Colorado
- Project: Full Sal
- Country: Chile
- Year: 2018
Engineering, manufacturing, supply, and assembly supervision of two 18″ wide conveyor belts for salt addition in the leaching process.
Albemarle - La Negra
- Proyecto: Capricornio
- Country: Chile
- Year: 2017
Engineering, manufacturing, supply and assembly supervision of seven conveyor belts for handling filtered salts and carbonates from the lithium extraction process.
Engineering, manufacturing, supply and assembly supervision of seven conveyor belts for handling filtered salts and carbonates from the lithium extraction process.
AES Gener - Guacolda Energía
- Project: Unit 5 - Thermoelectric Guacolda
- Country: Chile
- Year: 2017
EPC project for coal storage.
Supply of a 36″ conveyor, a 60″ high-slope belt, and a tripper conveyor.
Antofagasta Minerals- Minera Centinela
- Proyecto: Óxidos encuentros
- Country: Chile
- Year: 2015
Engineering, manufacturing, supply, and assembly supervision of fourteen conveyors for the oxide plant dry area.
Handling 2,400 TPH from the primary crusher to the agglomerator.
CODELCO - Filial Molyb Mejillones
- Project: Molyb Mejillones plant
- Country: Chile
- Year: 2014
Engineering, manufacturing, supply, and assembly supervision of two 24″ and three 18″ conveyor belts for molybdenum handling.
Technip & Areva
- Project: Imouraren Uranuim Project
- Country: Niger
- Year: 2012
Engineering, design, manufacturing, and supply of ten belt feeders for a uranium mine.
KGHM - Sierra Gorda
- Project: Sierra Gorda
- Country: Chile
- Year: 2012
Engineering, design, manufacturing, supply, and assembly supervision of a high-slope conveyor and a distribution belt for mill balls.
Glencore
- Proyecto: Antapaccay
- Country: Chile
- Year: 2011
Engineering, manufacturing, supply, and assembly supervision of eleven conveyors, including a high-slope belt for mill ball recovery.
Barrick
- Project: Pascua Lama
- Country: Chile - Argentina
- Year: 2010
Engineering, manufacturing, supply, and assembly supervision of sixteen conveyors, two high-slope belts, and fifteen belt feeders.
Lundin Mining - Candelaria
- Project: Concentrator expansion
- Country: Chile
- Year: 2007
Engineering, design, manufacturing, supply, and assembly supervision of six conveyors for the plant expansion.
Alcoa
- Proyecto: Fjardaal Aluminum Smelter
- Country: Iceland
- Year: 2006
Engineering, manufacturing, supply, and assembly supervision of five anode conveyors for an aluminum smelting facility.
